mjlinane
My name is Mike
This all started innocently enough: epoxy the floors. After 3 unsuccessful attempts (would not stick to the floor no matter what prep went into it), went with the super-dense tile. And then the upgraded stainless sink and commercial hose reel. And then the hot water heater (the inline couldn't keep up). Then the custom cabinetry and extra electrical. Then recovering from the chaos and finding (most) of my detailing gear. A year plus later, finally finished and got it mostly organized. Weather willing, should be posting much more regularly.
The first upgrade was actually going 6x triple T8 6500K fixtures. (Not shown.)
Still having trouble embedding the pics in the thread so made another video.
The first upgrade was actually going 6x triple T8 6500K fixtures. (Not shown.)
Still having trouble embedding the pics in the thread so made another video.