Gettin there!
Can`t wait for this finished product
Gettin there!
Can`t wait for this finished product
Well all of the painting is done and I even found time to get some trim paint. I let is all dry and the started on the floor My daugter(3 years old) was helping e put int he hopscoch and she was having a ton of fun while i didn`t get as far as i wanted to day I think i`m still doing well with time.
and where all of the stuff is right now
I love the progress reports! Keep it up!:up
The Stable
2017 Audi TTS
2014 Porsche Carrera S
2017 Porsche Macan GTS
1996 Porsche Carrera 4S
Well today is a long day as you can see my helper was up bright amd early and was still in her PJ`s when she doned the boots to help daddy with her help the flooring is 2/3 done and thank`s to my nephew I now have mived my peg board and build and put up three cabinets and one large floor cabinet. I`m strating to put stuff away and I havn`t gotten to painting the trim farther yet. but as you can see the couch is still there I need to move that out tomorrow and that will open things up along with the three detailing cabinets i plan on putting up tomorrow will be a busy day again
Your little girl looks so serious! The union rep must have gotten to her.
Looks like it is coming along nicely!
Yes, those union people keep getting younger and younger.
That garage is really coming along. I am looking forward to seeing how it finishes up. The flooring seems to make a big difference.
Lee
ES330 in Millenium Silver
Pretty nice of you to let your little girl use your tools and wear your Little Princess boots! (can`t fool us!)
Dig the floor!:up
The Stable
2017 Audi TTS
2014 Porsche Carrera S
2017 Porsche Macan GTS
1996 Porsche Carrera 4S
yeah, I have to agree with the others, that floor looks nice
where`d you get it? and how much?
I`m already dreaming of how to do my garage when I get a house next year...
Well the final cabenit are up and things are pretty much on the home streach if only i could catch a brake. while i was filling up the karosone heater my daguter woke up and while i was puting her to bed there was a siphen action that pulled the gas right out so after vacuming the fuel up there is still some to evaoprate I`m leaving the gargae door slighty open and venting it out the garage is sealed from the rest of the house so i should be ok.. anyways the floor is now 85% done and i`m seeing the light at the end of the tunnel.
Bam!
Comin along and almost done. Good call on the overhead storage.
This will be a sanctuary when done
Holy Moly! Thats some transformation there HP! Looking Good!!
Later ......
Mike
well it`s a little past noon and I`m calling this project
FINISHED
I`m glad all of you could join me on my quest and while the constrcution phase is done you all know now is the shove everything in the gargage phase but at least not i can fit two cars in the garage and not have to worry about puddles.
I want to use the VCT tiles....but I have a problem.
My garage slab is in excellent condition, but the previous owner but down a floor coating (dont know which brand), and of course it started getting hot tire pickup, etc.
Whats left on the floor now (power washed it when I moved in) is holding strong...I wonder if I could tile over the stuff that is still there , since it seems to have a good bond???
With a 3 car gargae, I dont want to do this twice!!!
MIKE
Ok first i didn`t use VCT tiles they are a race deck interlocking type tiles that are a vented design please look up the gargage tiles post to get pictures of these tiles. for a gargage with a DD in it I would go with nothing lesss because i don`t like puddles.
patrick
.89 a tile 460 sq ft of tiles
There are currently 1 users browsing this thread. (0 members and 1 guests)
Bookmarks