I got throught earlier today applying a layer of Blackfire Wet Diamond via PC 7424 on a LC red pad. I let it dry on for an 1 1/2 or so in the garage, since its a pretty hot day in the 90s with average summertime southeast humidity levels. I was really impressed on how easily it wiped completely and left the finish slick. I am considering adding a second layer, but wasn`t sure how long I should wait. I have heard anywhere from a couple hours to at least 8 hours. Since I am working in warmer and relative humid weather, how long should I wait before going with the second? Also, will the second layer signifigantly incure the durability of the product to achive the average 4 motnths or so that many people claim to get?

Is there any kind of cure time for Wet Diamond? Meaning a cetain amount of time the the vehicle should not be exposed to water, moisture, or washing to ensure proper bonding of the product?