06-27-2010, 09:12 PM
I thought I had this posted here and came to update it but I guess I never posted in the first place.
Anyway, its been some long hot days but its finally getting there.
60`x64` building just after being built. Those are 12` doors, the one in the back right is for the wash bay and lift. There is also another 12` door in the back left. That area will be for the toys (dirt bikes, 4 wheelers, go carts and such). The one in the front will be the main drive in door, 4 bays on the right, 3 on the left for car storage, office and bathroom.
http://img.photobucket.com/albums/v465/dubbin1/shop1.jpg
http://img.photobucket.com/albums/v465/dubbin1/shop2.jpg
crappy pic of concrete going in
http://img.photobucket.com/albums/v465/dubbin1/CopyofIMG00156.jpg
Insulation day (this day sucked)
http://img.photobucket.com/albums/v465/dubbin1/DSC01440.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01421.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01419.jpg
Working on the drywall
http://img.photobucket.com/albums/v465/dubbin1/DSC01451.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01448.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01452.jpg
This is where the wash bay will go and the 2 post lift will be in front of it
http://img.photobucket.com/albums/v465/dubbin1/DSC01453.jpg
Last night we cleaned everything out and will be coating the floor with U Coat It epoxy later this week.
Anyway, its been some long hot days but its finally getting there.
60`x64` building just after being built. Those are 12` doors, the one in the back right is for the wash bay and lift. There is also another 12` door in the back left. That area will be for the toys (dirt bikes, 4 wheelers, go carts and such). The one in the front will be the main drive in door, 4 bays on the right, 3 on the left for car storage, office and bathroom.
http://img.photobucket.com/albums/v465/dubbin1/shop1.jpg
http://img.photobucket.com/albums/v465/dubbin1/shop2.jpg
crappy pic of concrete going in
http://img.photobucket.com/albums/v465/dubbin1/CopyofIMG00156.jpg
Insulation day (this day sucked)
http://img.photobucket.com/albums/v465/dubbin1/DSC01440.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01421.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01419.jpg
Working on the drywall
http://img.photobucket.com/albums/v465/dubbin1/DSC01451.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01448.jpg
http://img.photobucket.com/albums/v465/dubbin1/DSC01452.jpg
This is where the wash bay will go and the 2 post lift will be in front of it
http://img.photobucket.com/albums/v465/dubbin1/DSC01453.jpg
Last night we cleaned everything out and will be coating the floor with U Coat It epoxy later this week.