I was pretty excited about BF because it had a faster cure time. I was all pumped to throw on a ton of coats right away. I ended up just doing the first two on the first day and then adding only 4 more coats over the course of a month. 5 layers was the peak for
Klasse and since the bottles of
Blackfire won't last as long as Klasse, I decided to spare some for later.

I supposed you could do 3 in one day. Maybe give each layer 20 minutes to cure or something just to be on the safe side. While one layer is curing you could be doing the glass or something. It would be a fun way to spend an entire day. Too bad that Murphy's law says that it will have to rain as soon as possible if you spend that much time on your car.
